麻豆人妻无码性色AV专区,亚洲AV极品无码专区在线观看,18禁美女黄网站色大片在线,秋霞无码久久久精品,宅男噜噜噜66网站在线观看,真人无码作爱免费视频网站,中国亚州女人69内射少妇,丝袜美腿亚洲一区二区,少妇高潮无套内谢麻豆传,国产精品无码AV片在线观看播

<center id="ojlzu"></center>
<rt id="ojlzu"></rt>
    <rt id="ojlzu"></rt>
  1. <rt id="ojlzu"></rt>
      1. Wuxi Gotele Metal Products Co., Ltd : CN EN
        首頁(yè) >>新聞動(dòng)態(tài) >>工程項(xiàng)目新聞

        Golden Gate Bridge: an Exceptional piece of Steel Engineering



        San Francisco’s Golden Gate Bridge is one of the most iconic bridges in the world. It is a so-called suspension bridge: the deck is supported by vertical cables attached to upper larger cables, which -in turn- extend between supporting towers and are anchored at the ends.


        The bridge’s construction begun in 1933 and gave chances of employment during the US’s Great Depression. The design was assigned to engineer Joseph Strauss. The constructions time took 4 years costing $35 million and featuring some extreme scenarios.


        For example, 3.25 million cubic feet (92,030 cubic metres) of soil excavations were required for establishing the bridge’s anchorages and they are 12-floors tall! The divers had to submerge as deep as 90 feet (27.4 m) in the water to explode rocks and then remove the debris! Despite such difficulties, the bridge finally opened in 1937.


        On-site construction of the suspension cables began in 1935. All the bridge’s cables are made of galvanized carbon steel wires and they were laid by a ‘spinning’ technique.


        The two main cables alone account for 61,500 tons of weight load on the two 746-ft-tall (227 m) towers! The wires pass on top of the towers and are secured at each end in massive anchorages. The main cables measure 36.22 inches in diameter and they extend for 7,650 ft (2,332 m) each!


        Such massive cables were manufactured by grouping together 61 bundles of wire. In turn, each of these is made up of 452 smaller wires, for a total of 27,572 cables! As for the vertical suspended cables, they tie the bridge’s deck to the main cables. There are 250 pairs of them; they are spaced 50 feet apart from each other and measure from 2 to 16 inches in diameter.  All of the vertical ropes were replaced between 1972 and 1976.


        It is interesting how the Golden Gate Bridge ‘dances’ up and down depending on the temperature. Hot days with high temperature cause the metal to expand; steel cables elongate and the bridge’s deck lowers. This is especially visible in its central part. Moreover, painting the ‘Red Bridge’ is a non-stop task and of primary importance. In fact, the paint applied to the steel prevents both corrosion and rust that the air with high salt content in may cause.


        At Wuxi Gotele Metal Corporation we are passionate about bridges engineering and infrastructure technologies. With the help of our experts we proudly supply products such as Steel Truss Bridge, Diagonal Span Arch Bridge and Compact Panel Bridge. For further information and a full list of products, please click here.

        首頁(yè)電話產(chǎn)品導(dǎo)航
        CN EN
        绯色av一区二区三区四区| 日本黑人三级精品久久| 尤物久久av一区二区三区| 亚洲宅男精品一区在线观看| 日韩中文字幕首页一区| 中文字幕人妻无码一夲道| 午夜精品一区二区福利| 国产av一区二区久久| 麻豆密入视频在线观看| 亚洲精品一区二区麻豆| 国产精品无套粉嫩白浆在线| 亚洲av激情男人的天堂| 国产亚洲日韩AV在线播放不卡| 亚洲丰满成熟少妇毛茸茸| 久久见久久久国产精品| 国产成视频在线观看| 亚洲精品国产主播一区| 日韩亚洲国产一区情侣| 国产精品福利中文字幕| 粗一硬一长一进一爽一A级| 欧美性猛交XXXX乱大交蜜桃| 尤物视频网站免费在线看| 亚洲制服丝袜无码AV在线| 午夜国产成人福利视频| 亚洲一区二区有码在线| 人妻一区二区三区人妻黄色| 深夜亚洲精品免费福利你懂的 | 美国精品毛毛片一区二区| 日本最新免费二区三区| 精品丝袜一区二区三区性色| 日本一区二区亚洲三区| 国产精品中文字幕综合| 日本丰满熟女一区二区| 中文无码妇乱子伦视频| 日本在线中文字幕三区| 欧洲精品VA无码一区二区三区 | 成人av免费观看免费| 国产在线 | 中文| 精品熟女少妇av久久图| 老司机久久精品最新免费| 少妇人妻熟女一区二区三区|