麻豆人妻无码性色AV专区,亚洲AV极品无码专区在线观看,18禁美女黄网站色大片在线,秋霞无码久久久精品,宅男噜噜噜66网站在线观看,真人无码作爱免费视频网站,中国亚州女人69内射少妇,丝袜美腿亚洲一区二区,少妇高潮无套内谢麻豆传,国产精品无码AV片在线观看播

<center id="ojlzu"></center>
<rt id="ojlzu"></rt>
    <rt id="ojlzu"></rt>
  1. <rt id="ojlzu"></rt>
      1. Wuxi Gotele Metal Products Co., Ltd : CN EN
        Home >>News >>News of Construction and Building

        Golden Gate Bridge: an Exceptional piece of Steel Engineering



        San Francisco’s Golden Gate Bridge is one of the most iconic bridges in the world. It is a so-called suspension bridge: the deck is supported by vertical cables attached to upper larger cables, which -in turn- extend between supporting towers and are anchored at the ends.


        The bridge’s construction begun in 1933 and gave chances of employment during the US’s Great Depression. The design was assigned to engineer Joseph Strauss. The constructions time took 4 years costing $35 million and featuring some extreme scenarios.


        For example, 3.25 million cubic feet (92,030 cubic metres) of soil excavations were required for establishing the bridge’s anchorages and they are 12-floors tall! The divers had to submerge as deep as 90 feet (27.4 m) in the water to explode rocks and then remove the debris! Despite such difficulties, the bridge finally opened in 1937.


        On-site construction of the suspension cables began in 1935. All the bridge’s cables are made of galvanized carbon steel wires and they were laid by a ‘spinning’ technique.


        The two main cables alone account for 61,500 tons of weight load on the two 746-ft-tall (227 m) towers! The wires pass on top of the towers and are secured at each end in massive anchorages. The main cables measure 36.22 inches in diameter and they extend for 7,650 ft (2,332 m) each!


        Such massive cables were manufactured by grouping together 61 bundles of wire. In turn, each of these is made up of 452 smaller wires, for a total of 27,572 cables! As for the vertical suspended cables, they tie the bridge’s deck to the main cables. There are 250 pairs of them; they are spaced 50 feet apart from each other and measure from 2 to 16 inches in diameter.  All of the vertical ropes were replaced between 1972 and 1976.


        It is interesting how the Golden Gate Bridge ‘dances’ up and down depending on the temperature. Hot days with high temperature cause the metal to expand; steel cables elongate and the bridge’s deck lowers. This is especially visible in its central part. Moreover, painting the ‘Red Bridge’ is a non-stop task and of primary importance. In fact, the paint applied to the steel prevents both corrosion and rust that the air with high salt content in may cause.


        At Wuxi Gotele Metal Corporation we are passionate about bridges engineering and infrastructure technologies. With the help of our experts we proudly supply products such as Steel Truss Bridge, Diagonal Span Arch Bridge and Compact Panel Bridge. For further information and a full list of products, please click here.

        HomeTelProductsContact
        CN EN
        狠狠综合av一区二区三区| 厕所极品偷拍一区二区三区视频 | 亚洲一区极品美女写真在线看| 久久亚洲AV无码精品色午夜麻豆 | 色精品一区二区综合久久| 国产亚洲欧美日韩综合久久| 亚洲性色成人AV天堂| av一区二区三区久久| 亚洲国产日韩精品视频| 中文字幕在线一区二区不卡| 97成人免费在线视频| 国产精品成人一区二区| 18禁黄网站禁片无遮挡观看| 亚洲黄色成人在线观看| 校园春色亚洲一区二区| 丝袜长腿中文字幕人妻熟女| 亚洲中文久久精品无码软件| 激情综合亚洲色婷婷五月APP| 日韩精品一区二区三区人妻| 国产精品黄色在线观看| 日韩精品国产精品国产| 国产成人亚洲精品无码车A| 在线播放国产高潮流白浆视频| 亚洲婷婷网| 国产精品流白浆无遮挡| av亚洲一区二区三区| 麻豆精品传媒一二三区| 亚洲 欧美 日韩 国产综合 在线| 亚洲国产欧美一区三区成人| 国产精品欧美激情大秀| 在线一区二区三区观看视频| 日产国产一区二区不卡| 国产精品久久久久久久99| 欧美制服丝袜亚洲自拍偷拍| 亚洲欧洲精品一区二区| 久久国产一区中文字幕| 老司机亚洲精品影院无码| 国产亚洲AV片在线观看播放| 看全色黄大黄大色免费久久| 美女高潮无套内射视频| 性无码一区二区三区在线观看|