麻豆人妻无码性色AV专区,亚洲AV极品无码专区在线观看,18禁美女黄网站色大片在线,秋霞无码久久久精品,宅男噜噜噜66网站在线观看,真人无码作爱免费视频网站,中国亚州女人69内射少妇,丝袜美腿亚洲一区二区,少妇高潮无套内谢麻豆传,国产精品无码AV片在线观看播

<center id="ojlzu"></center>
<rt id="ojlzu"></rt>
    <rt id="ojlzu"></rt>
  1. <rt id="ojlzu"></rt>
      1. Wuxi Gotele Metal Products Co., Ltd : CN EN
        Home >>News >>News of Construction and Building

        Golden Gate Bridge: an Exceptional piece of Steel Engineering



        San Francisco’s Golden Gate Bridge is one of the most iconic bridges in the world. It is a so-called suspension bridge: the deck is supported by vertical cables attached to upper larger cables, which -in turn- extend between supporting towers and are anchored at the ends.


        The bridge’s construction begun in 1933 and gave chances of employment during the US’s Great Depression. The design was assigned to engineer Joseph Strauss. The constructions time took 4 years costing $35 million and featuring some extreme scenarios.


        For example, 3.25 million cubic feet (92,030 cubic metres) of soil excavations were required for establishing the bridge’s anchorages and they are 12-floors tall! The divers had to submerge as deep as 90 feet (27.4 m) in the water to explode rocks and then remove the debris! Despite such difficulties, the bridge finally opened in 1937.


        On-site construction of the suspension cables began in 1935. All the bridge’s cables are made of galvanized carbon steel wires and they were laid by a ‘spinning’ technique.


        The two main cables alone account for 61,500 tons of weight load on the two 746-ft-tall (227 m) towers! The wires pass on top of the towers and are secured at each end in massive anchorages. The main cables measure 36.22 inches in diameter and they extend for 7,650 ft (2,332 m) each!


        Such massive cables were manufactured by grouping together 61 bundles of wire. In turn, each of these is made up of 452 smaller wires, for a total of 27,572 cables! As for the vertical suspended cables, they tie the bridge’s deck to the main cables. There are 250 pairs of them; they are spaced 50 feet apart from each other and measure from 2 to 16 inches in diameter.  All of the vertical ropes were replaced between 1972 and 1976.


        It is interesting how the Golden Gate Bridge ‘dances’ up and down depending on the temperature. Hot days with high temperature cause the metal to expand; steel cables elongate and the bridge’s deck lowers. This is especially visible in its central part. Moreover, painting the ‘Red Bridge’ is a non-stop task and of primary importance. In fact, the paint applied to the steel prevents both corrosion and rust that the air with high salt content in may cause.


        At Wuxi Gotele Metal Corporation we are passionate about bridges engineering and infrastructure technologies. With the help of our experts we proudly supply products such as Steel Truss Bridge, Diagonal Span Arch Bridge and Compact Panel Bridge. For further information and a full list of products, please click here.

        HomeTelProductsContact
        CN EN
        久久久久久人妻无码| 亚洲蜜桃麻豆激情在线| 夫妻一起自拍内射小视频| 精品不卡一区二区三区| 国产香蕉一区二区三区| 人妻少妇av在线观看| 亚洲天堂中文在线观看| 一级黄片国产精品久久| 久久精品午夜一区二区| 成人欧美一区二区三区| 免费人成网| 免费精品国产人妻av| 久久精品这里就是精品| 无套内射年轻人妻少妇 | 国产麻豆精品久久一二三 | 亚洲日本精品视频在线| 久久综合亚洲欧美成人| 天堂亚洲视频在线观看| 国产精品性一区二区三区| 人妻中文字幕精品在线| 自拍偷区亚洲综合激情| 国产精品香港三级国产AV| 国产又粗又猛的免费视频| 亚洲处破女av一区二区| 中文字幕精品亚洲四区| 亚洲激情综合中文字幕| 99国产精品99久久久久久| 伊人色综合久久天天伊人婷| 日韩中文字幕精品一区| 日韩欧精品无码视频无删节| 蜜桃成熟时日本一区二区| 日韩一区二区在线看一| 无码人妻熟妇AV又粗又大| 亚洲视频在线播放免费视频| 亚洲av成人一区二区三区色| 熟女无套高潮内射视频| 国产乱码一区二区精品| 日本男人精品一区二区| 精品久久精品久久人妻| 日本黄区午夜一二三区| 国产一区二区真实视频|